Construction sites and mining operations present the harshest distribution environment in electrical engineering. Distribution transformers must:
The Pain Point:
A single distribution transformer failure can halt a multi-million-dollar construction schedule or stop mineral extraction worth hundreds of thousands of dollars per day.

We provide ruggedized distribution transformers engineered to withstand extreme mechanical, thermal, and environmental stress for uninterrupted site power.

50–3150 kVA
C5-M coating, seismic bracing
100–2500 kVA
IP54 enclosed, AF overload rated
100–1600 kVA
Skid-mounted, mine-spec certified
160–1250 kVA
Trailer/skid-mountable, rapid deploy
| Parameter | S13-M.RG Rugged | SCB10-RG Dry-Type |
|---|---|---|
| Rated Capacity | 50–3150 kVA | 100–2500 kVA |
| HV Rating | 3.3/6.6/11/13.8/22/33 kV | 6/10/11/13.8 kV |
| LV Rating | 400/415/480/690 V | 400/415/480 V |
| Cooling | ONAN | AN/AF |
| Ambient Range | -40°C to +55°C | -25°C to +50°C |
| Corrosion Class | C5-M (ISO 12944) | C3/C4 |
| Enclosure | IP55 | IP54 |
| Motor-Start Z% | 4.5%–6.0% | 6.0% |
| DOL Starting Capability | 60% of rating | 50% of rating |